Your address will show here +12 34 56 78
Medium Voltage Projects

Client: International Organization on Migration

Project Completion Date: August 3, 2023

Project Overview: Abiget Limited is pleased to announce the successful completion of the project involving the fabrication and supply of a 1600A Changeover Distribution Panel for the esteemed International Organization on Migration. Executed on August 3, 2023, this project signifies a significant milestone in our commitment to delivering high-quality electrical engineering solutions to our valued clients.

Project Scope:

  • Fabrication: Abiget Limited undertook the fabrication of a bespoke 1600A Changeover Distribution Panel tailored to the specific requirements and standards of the International Organization on Migration.

  • Supply: In addition to fabrication, we ensured the timely and precise delivery of the Distribution Panel to the client’s designated location.

Project Objectives:

  1. Reliable Power Management: The primary objective of this project was to provide the International Organization on Migration with a robust and reliable Changeover Distribution Panel, enhancing their capacity to manage and switch between power sources seamlessly.

  2. Compliance and Safety: Abiget Limited adhered to all relevant safety and quality standards during fabrication to ensure the Distribution Panel’s compliance with international safety regulations.

  3. Operational Efficiency: The customized Distribution Panel is designed to optimize the International Organization on Migration’s power distribution system, resulting in improved operational efficiency and reduced downtime.

Key Benefits:

  • Enhanced Power Management: The 1600A Changeover Distribution Panel empowers the client to efficiently manage power sources, ensuring a stable and uninterrupted power supply.

  • Safety Assurance: Abiget’s commitment to safety standards guarantees the safety of both personnel and equipment during power switching operations.

  • Improved Operations: With the new Distribution Panel in place, the International Organization on Migration can operate with increased efficiency and flexibility.

  • Reliable Partner: Abiget Limited’s successful completion of this project reinforces our reputation as a reliable and trusted partner for electrical engineering solutions.

Abiget Limited takes great pride in the successful execution of this project for the International Organization on Migration. We remain dedicated to delivering excellence in all our endeavors and look forward to future collaborations that drive innovation and progress in the field of electrical engineering.

0

Uncategorized

Client: Honeywell

Location: Interchange Sagamu, Nigeria

Project Commencement: September 2023

Project Overview: Abiget Limited is proud to announce the completion of her project with Honeywell, providing a critical 680KW Loadbank Rental solution for the Interchange Sagamu facility in Nigeria. Completed in September 2023, this project represents a significant milestone in our commitment to delivering top-tier electrical engineering services.

Project Scope:

  • Loadbank Rental: Abiget Limited will supply and deploy a robust 680KW Loadbank system, meticulously designed to meet the precise requirements of Honeywell’s power infrastructure at the Interchange Sagamu site. The Loadbank will serve as a vital tool for testing and validating the facility’s electrical systems, ensuring optimal performance and reliability.

Project Objectives:

  1. Performance Validation: The primary objective is to validate the performance of Honeywell’s power systems under varying loads. The Loadbank will simulate real-world conditions, allowing comprehensive testing without affecting the facility’s actual operations.

  2. Reliability Assurance: Abiget’s Loadbank solution will provide critical insights into the reliability of the power infrastructure, identifying potential issues and ensuring that backup systems operate seamlessly in the event of a power disruption.

  3. Efficiency Optimization: By thoroughly testing the facility’s electrical systems, Honeywell aims to optimize energy efficiency, reduce downtime, and enhance overall operational effectiveness.

Key Benefits:

  • Minimized Downtime: Using the Loadbank for testing minimizes the risk of unexpected power disruptions during routine maintenance or system upgrades.

  • Enhanced Reliability: The Loadbank helps identify and rectify potential issues before they impact operations, ensuring uninterrupted power supply.

  • Efficiency Gains: By fine-tuning the electrical systems, Honeywell can achieve energy savings and reduce operational costs over time.

  • Peace of Mind: The project provides Honeywell with the confidence that their power infrastructure can reliably support their critical operations.

Abiget Limited is excited to collaborate with Honeywell on this vital project, and we are committed to delivering exceptional services, meeting all project objectives, and contributing to the success of the Interchange Sagamu facility. Stay tuned for updates on our progress and the successful completion of this endeavor in September 2023.

 
0