Uncategorized

680KW Loadbank Rental for Honeywell at Interchange Sagamu – September 2023

Client: Honeywell

Location: Interchange Sagamu, Nigeria

Project Commencement: September 2023

Project Overview: Abiget Limited is proud to announce the completion of her project with Honeywell, providing a critical 680KW Loadbank Rental solution for the Interchange Sagamu facility in Nigeria. Completed in September 2023, this project represents a significant milestone in our commitment to delivering top-tier electrical engineering services.

Project Scope:

  • Loadbank Rental: Abiget Limited will supply and deploy a robust 680KW Loadbank system, meticulously designed to meet the precise requirements of Honeywell’s power infrastructure at the Interchange Sagamu site. The Loadbank will serve as a vital tool for testing and validating the facility’s electrical systems, ensuring optimal performance and reliability.

Project Objectives:

  1. Performance Validation: The primary objective is to validate the performance of Honeywell’s power systems under varying loads. The Loadbank will simulate real-world conditions, allowing comprehensive testing without affecting the facility’s actual operations.

  2. Reliability Assurance: Abiget’s Loadbank solution will provide critical insights into the reliability of the power infrastructure, identifying potential issues and ensuring that backup systems operate seamlessly in the event of a power disruption.

  3. Efficiency Optimization: By thoroughly testing the facility’s electrical systems, Honeywell aims to optimize energy efficiency, reduce downtime, and enhance overall operational effectiveness.

Key Benefits:

  • Minimized Downtime: Using the Loadbank for testing minimizes the risk of unexpected power disruptions during routine maintenance or system upgrades.

  • Enhanced Reliability: The Loadbank helps identify and rectify potential issues before they impact operations, ensuring uninterrupted power supply.

  • Efficiency Gains: By fine-tuning the electrical systems, Honeywell can achieve energy savings and reduce operational costs over time.

  • Peace of Mind: The project provides Honeywell with the confidence that their power infrastructure can reliably support their critical operations.

Abiget Limited is excited to collaborate with Honeywell on this vital project, and we are committed to delivering exceptional services, meeting all project objectives, and contributing to the success of the Interchange Sagamu facility. Stay tuned for updates on our progress and the successful completion of this endeavor in September 2023.

 

Author


Avatar